Poke &Wiggle

Leaderboard

Model

GR00T N1.7

NVIDIA

#4

Rank · PAW-GEN-10

Model information

Website
Website⁠ (opens in a new tab)
Paper
arXiv⁠ (opens in a new tab)
Code
NVIDIA/Isaac-GR00T⁠ (opens in a new tab)
Parameters
3B
Released
April 2026
Licence
Apache-2.0

PAW-GEN-10

Share of episodes rated Ok or Excellent.

Summary

Overall Success
12%
Evaluations
3600
NominalEvaluated on the placements the model was trained on.InterpolationEvaluated on unseen placements between the training placements.ExtrapolationEvaluated on unseen placements outside the training placements' convex hull.
EnvironmentNominal · D10Trained on ~10 demonstrations per environment.Nominal · D100Trained on ~100 demonstrations per environment.Nominal · D300Trained on ~300 demonstrations per environment.Interpolation · D10Trained on ~10 demonstrations per environment.Interpolation · D100Trained on ~100 demonstrations per environment.Interpolation · D300Trained on ~300 demonstrations per environment.Extrapolation · D10Trained on ~10 demonstrations per environment.Extrapolation · D100Trained on ~100 demonstrations per environment.Extrapolation · D300Trained on ~300 demonstrations per environment.
Basic skills
Sort screws into bins3%#295% CI 1%–17%13%#295% CI 5%–30%0%#395% CI 0%–11%0%#195% CI 0%–11%0%#195% CI 0%–11%0%#395% CI 0%–11%Coming soon
Datum-corner alignment0%#495% CI 0%–11%0%#495% CI 0%–11%37%#395% CI 22%–54%7%#195% CI 2%–21%0%#495% CI 0%–11%40%#395% CI 25%–58%Coming soon
Pour screws into the funnel7%#495% CI 2%–21%33%#495% CI 19%–51%53%#495% CI 36%–70%3%#395% CI 1%–17%7%#495% CI 2%–21%47%#495% CI 30%–64%Coming soon
High precision
Connect DC jack0%#195% CI 0%–11%3%#495% CI 1%–17%0%#295% CI 0%–11%0%#195% CI 0%–11%3%#195% CI 1%–17%0%#195% CI 0%–11%Coming soon
Route cable through closed hoops0%#195% CI 0%–11%0%#395% CI 0%–11%0%#395% CI 0%–11%0%#195% CI 0%–11%3%#295% CI 1%–17%0%#395% CI 0%–11%Coming soon
Put tools in standing toolbox0%#295% CI 0%–11%0%#495% CI 0%–11%3%#395% CI 1%–17%0%#195% CI 0%–11%0%#295% CI 0%–11%3%#295% CI 1%–17%Coming soon
Bimanual
Place loaded boxes in container (bimanual)3%#295% CI 1%–17%27%#395% CI 14%–44%0%#495% CI 0%–11%17%#195% CI 7%–34%23%#395% CI 12%–41%13%#395% CI 5%–30%Coming soon
Place spray bottles upright, nozzle forward (bimanual handover)17%#295% CI 7%–34%67%#495% CI 49%–81%73%#395% CI 56%–86%10%#195% CI 3%–26%60%#495% CI 42%–75%73%#495% CI 56%–86%Coming soon
Tool use
Open the toolbox with a screwdriver0%#195% CI 0%–11%20%#395% CI 10%–37%20%#395% CI 10%–37%3%#195% CI 1%–17%17%#295% CI 7%–34%17%#495% CI 7%–34%Coming soon
Clamp electrical component0%#195% CI 0%–11%0%#495% CI 0%–11%0%#495% CI 0%–11%0%#195% CI 0%–11%0%#295% CI 0%–11%0%#295% CI 0%–11%Coming soon
Pooled3%#495% CI 2%–6%16%#495% CI 13%–21%19%#495% CI 15%–23%4%#195% CI 2%–7%11%#495% CI 8%–15%19%#495% CI 15%–24%Coming soon

Data Scaling

Scaling results for GR00T N1.7: SuccessGR00T N1.7 nominal: D10 3% (95% CI 2%–6%), D100 16% (95% CI 13%–21%), D300 19% (95% CI 15%–23%). GR00T N1.7 interpolation: D10 4% (95% CI 2%–7%), D100 11% (95% CI 8%–15%), D300 19% (95% CI 15%–24%).Success rate (%)03060GR00T N1.7 nominal: 3% (95% CI 2%–6%) on D10GR00T N1.7 nominal: 16% (95% CI 13%–21%) on D100GR00T N1.7 nominal: 19% (95% CI 15%–23%) on D300GR00T N1.7 interpolation: 4% (95% CI 2%–7%) on D10GR00T N1.7 interpolation: 11% (95% CI 8%–15%) on D100GR00T N1.7 interpolation: 19% (95% CI 15%–24%) on D300D10D100D300

Spatial Generalization

Spatial generalization for GR00T N1.7: SuccessGR00T N1.7: Nominal 13% (95% CI 11%–15%), Interpolation 12% (95% CI 10%–14%), Extrapolation coming soon.Success rate (%)03060Coming soonGR00T N1.7: 13% (95% CI 11%–15%) on NominalGR00T N1.7: 12% (95% CI 10%–14%) on InterpolationNominalInterpolationExtrapolation

Per Environment (Success)

Model performance by environmentGR00T N1.7 overall: Sort screws into bins 3%, Datum-corner alignment 14%, Pour screws into the funnel 25%, Connect DC jack 1%, Route cable through closed hoops 1%, Put tools in standing toolbox 1%, Place loaded boxes in container (bimanual) 14%, Place spray bottles upright, nozzle forward (bimanual handover) 50%, Open the toolbox with a screwdriver 13%, Clamp electrical component 0%.Sort screws into binse01Datum-corner alignmente02Pour screws into the funnele03Connect DC jacke04Route cable through closed hoopse05Put tools in standing toolboxe06Place loaded boxes in container (bimanual)e07Place spray bottles upright, nozzle forward (bimanual handover)e08Open the toolbox with a screwdrivere09Clamp electrical componente10Basic skillsHigh precisionBimanualTool use

Training parameters

Starting checkpoint
nvidia/GR00T-N1.7-3B
Frozen part
Vision and language towers
Total batch size
64
Learning rate
1e-4
Schedule
Warmup, then cosine to 0
Action chunk
32
Action space
Relative TCP pose

Compare every model's parameters

Rollouts

Mid-training dataM0
Task-specific dataD300
SpatialInterpolation

One clip per environment from this entry's evaluation, beside where each evaluation episode placed the environment's objects, coloured by its rating; a placement several episodes shared is drawn once, in their ratings' colours mixed. Use the button beside each environment to open its evaluation dataset in the dataset viewer. One episode is available to watch; the remaining episodes can be requested in case of a dispute or for another legitimate reason.

  1. Sort screws into bins
    Success
    0%
    Progress
    59%
  2. Pour screws into the funnel
    Success
    47%
    Progress
    63%
  3. Connect DC jack
    Success
    0%
    Progress
    28%
  4. Route cable through closed hoops
    Success
    0%
    Progress
    22%
  5. Open the toolbox with a screwdriver
    Success
    17%
    Progress
    40%
  6. Held-out benchmark environment
    Datum-corner alignment
    Success
    40%
    Progress
    40%
  7. Held-out benchmark environment
    Put tools in standing toolbox
    Success
    3%
    Progress
    26%
  8. Held-out benchmark environment
    Place loaded boxes in container (bimanual)
    Success
    13%
    Progress
    46%
  9. Held-out benchmark environment
    Place spray bottles upright, nozzle forward (bimanual handover)
    Success
    73%
    Progress
    87%
  10. Held-out benchmark environment
    Clamp electrical component
    Success
    0%
    Progress
    39%

Success by dataset size

e01 · Sort screws into bins
D10: 2% (95% CI 0%–9%)D100: 7% (95% CI 3%–16%)D300: 0% (95% CI 0%–6%)D10D100D300
e02 · Datum-corner alignment
D10: 3% (95% CI 1%–11%)D100: 0% (95% CI 0%–6%)D300: 38% (95% CI 27%–51%)D10D100D300
e03 · Pour screws into the funnel
D10: 5% (95% CI 2%–14%)D100: 20% (95% CI 12%–32%)D300: 50% (95% CI 38%–62%)D10D100D300
e04 · Connect DC jack
D10: 0% (95% CI 0%–6%)D100: 3% (95% CI 1%–11%)D300: 0% (95% CI 0%–6%)D10D100D300
e05 · Route cable through closed hoops
D10: 0% (95% CI 0%–6%)D100: 2% (95% CI 0%–9%)D300: 0% (95% CI 0%–6%)D10D100D300
e06 · Put tools in standing toolbox
D10: 0% (95% CI 0%–6%)D100: 0% (95% CI 0%–6%)D300: 3% (95% CI 1%–11%)D10D100D300
e07 · Place loaded boxes in container (bimanual)
D10: 10% (95% CI 5%–20%)D100: 25% (95% CI 16%–37%)D300: 7% (95% CI 3%–16%)D10D100D300
e08 · Place spray bottles upright, nozzle forward (bimanual handover)
D10: 13% (95% CI 7%–24%)D100: 63% (95% CI 51%–74%)D300: 73% (95% CI 61%–83%)D10D100D300
e09 · Open the toolbox with a screwdriver
D10: 2% (95% CI 0%–9%)D100: 18% (95% CI 11%–30%)D300: 18% (95% CI 11%–30%)D10D100D300
e10 · Clamp electrical component
D10: 0% (95% CI 0%–6%)D100: 0% (95% CI 0%–6%)D300: 0% (95% CI 0%–6%)D10D100D300

Success by spatial configuration

e01 · Sort screws into bins
Nominal: 6% (95% CI 2%–12%)Interpolation: 0% (95% CI 0%–4%)ComingsoonNominalInterp.Extrap.
e02 · Datum-corner alignment
Nominal: 12% (95% CI 7%–21%)Interpolation: 16% (95% CI 9%–24%)ComingsoonNominalInterp.Extrap.
e03 · Pour screws into the funnel
Nominal: 31% (95% CI 22%–41%)Interpolation: 19% (95% CI 12%–28%)ComingsoonNominalInterp.Extrap.
e04 · Connect DC jack
Nominal: 1% (95% CI 0%–6%)Interpolation: 1% (95% CI 0%–6%)ComingsoonNominalInterp.Extrap.
e05 · Route cable through closed hoops
Nominal: 0% (95% CI 0%–4%)Interpolation: 1% (95% CI 0%–6%)ComingsoonNominalInterp.Extrap.
e06 · Put tools in standing toolbox
Nominal: 1% (95% CI 0%–6%)Interpolation: 1% (95% CI 0%–6%)ComingsoonNominalInterp.Extrap.
e07 · Place loaded boxes in container (bimanual)
Nominal: 10% (95% CI 5%–18%)Interpolation: 18% (95% CI 11%–27%)ComingsoonNominalInterp.Extrap.
e08 · Place spray bottles upright, nozzle forward (bimanual handover)
Nominal: 52% (95% CI 42%–62%)Interpolation: 48% (95% CI 38%–58%)ComingsoonNominalInterp.Extrap.
e09 · Open the toolbox with a screwdriver
Nominal: 13% (95% CI 8%–22%)Interpolation: 12% (95% CI 7%–21%)ComingsoonNominalInterp.Extrap.
e10 · Clamp electrical component
Nominal: 0% (95% CI 0%–4%)Interpolation: 0% (95% CI 0%–4%)ComingsoonNominalInterp.Extrap.